CASE STUDIES
![Bulk Removal of Sludge in Clarifier Tank Bulk Removal of Sludge in Clarifier Tank](https://ecorobotics.com/wp-content/uploads/2018/12/eco_casestudy1-clairfiertank.jpg)
CLARIFIER TANK SLUDGE REMOVAL
Bulk Removal of Sludge in Clarifier Tank
Southeast Texas Petro-Chemical Plant, September 2017
H5 Robotic System: Vacuum + Processing + H5 Robot
Closed top tank – 85’ diameter x 30’ height with 24” coned floor
Using a conventional material removal method this project would have taken 138 days and removed 133 bbl/day and required 1383 hours of confined space entry. Using robotic systems the project took 29 days, removed 634.5 bbl/day for a total volume of 18,400 bbls removed with no confined space entry.
WATER TREATMENT TANK SLUDGE REMOVAL
Bulk Removal of Sludge in Waste Water Treatment Tank
Gulf Coast Petro-Chemical Plant, October 2017
H5 Robotic System: Vacuum + Processing + H5 Robot Square Concrete Basin Tank
Using robotic systems the project took 8 days, removed 560 bbl/day for a total volume of 4,480 bbls removed with no confined space entry.
![Bulk Removal of Sludge in Waste Water Treatment Tank Bulk Removal of Sludge in Waste Water Treatment Tank](https://ecorobotics.com/wp-content/uploads/2018/12/eco_casestudy2-wastewatertreatment.jpg)
![PowerPoint Presentation PowerPoint Presentation](https://ecorobotics.com/wp-content/uploads/2018/12/eco_casestudy3-spilltank.jpg)
SPILL TANK BULK REMOVAL
Bulk Removal in Spill Tank
Mid-West Chemical Plant, July 2017
H5 Robotic System: Vacuum + Processing + H5 Robot Closed top tank – 63’ diameter x 32’ height
Using a conventional material removal method this project has taken 67 days and removed 150 bbl/day and required 670 hours of confined space entry. Using robotic systems the project took 11 days, removed 918 bbl/day for a total volume of 10,100 bbls removed with no confined space entry.